f Infrastructure & Utility - 304 Industrial Park, Thailand
CLOSE

Infrastructure and Utility

Water Supply Diagram

Reliable Utility Supply

At 304 Industrial Park, we support our partners with high quality infrastructure for both large to small scale manufacturing, including over on-site 893 MW power plants, an own man-made reservoir with a planned water management system to eliminate the possibility of flooding, a waste water treatment system, advanced communications technology as well as, a logistics and supply chain management of our dedicated subsidiary companies.

Water Supply Diagram

Unlimited Water Supply & Water Management Systems

Our own man-made reservoir has a capacity of 40 million cubic meters whilst our tap water facility can produce up to 320,000 cubic meters per day.

Water Supply Diagram

Unlimited Use of Electricity

On-site power plants, offers a maximum power capacity of 893 megawatts to supply throughout the site; supplementary emergency power reserves from the Provincial Electricity Authority have also been arranged.

  • 893MW On-Site plants
  • 24 Hours Backup System
  • Currently have around 50% excess capacity to national grid
Hybrid Biomass and Solar Energy

Hybrid Biomass and Solar Energy

We are the sole provider capable of supplying renewable energy sufficient to meet the demands of all industries. This is achieved through an integration of a biomass power plant and a floating solar power farm, both of which are the largest private-sector projects of their kind in Thailand, located within the industrial park’s reservoirs.

  • Biomass energy: 398 MW capacity with I-REC certification
  • Floating solar power: 157 MW capacity